Results 1 to 6 of 6
Thread: RMR / DeltaPoint Review
Threaded View
-
23 May 2011, 08:25 #5
Member
- Join Date
- Mar 2010
- Posts
- 72
- Downloads
- 0
- Uploads
- 0
I had a local smith do the milling of the slides, he did my three M&P's and My Three Glocks before that. Excellent work. His turn around time is 1-2 Weeks and his price absolutely cannot be beat. I can give you his contact info if you would like. I havent tried the MRDS at all, but I hear good things about it. I prefer no switch at all and the battery life on it seems low.




Reply With Quote